I spent a lot of time trying to get the right windows for the cottage. The first priority and problem was trying to find a window/glass that would allow heat in. Most windows today are designed to keep heat in the house and use the title E2 ('E-squared') to indicate the efficiency. The problem with E2 windows is that in addition to keeping heat in they keep heat out while I'm counting on the sun to warm up the concrete floors.
So I called lots of companies; retailers, window manufacturers, and glass manufacturers to try and get the right window characteristics - one with good solar heat gain (SHGC or solar heat gain coefficient) and good efficiency (as measured by u-value or the rate at which heat transfers through the material).
I thought I had reached a reasonable solution with Milgard's Hardcoat Low-e product but I was disappointed when, after already ordering the product, I found the SHGC numbers to be moderate at best. But, what's done is done and we'll see how they perform.
Monday, December 17, 2007
Wednesday, December 5, 2007
Monday, December 3, 2007
Framing
Sunday, November 18, 2007
Slab maintenance
Slab pour
Saturday, November 10, 2007
The foundation coming together.
After the footings were poured we added about 6" of gravel

Then a layer of plastic to keep moisture from coming up into the slab

Then a layer of insulation

Then sand and rebar

Contralo and Samuel did most of the inner slab work at Mike Wright's direction

Then I added the radiant floor tubing

Rick Wilson came by and helped pressure test the tubing and on Friday afternoon we received approval from the building department to proceed with the slab pour, scheduled for Monday.
Then a layer of plastic to keep moisture from coming up into the slab
Then a layer of insulation
Then sand and rebar
Contralo and Samuel did most of the inner slab work at Mike Wright's direction
Then I added the radiant floor tubing
Rick Wilson came by and helped pressure test the tubing and on Friday afternoon we received approval from the building department to proceed with the slab pour, scheduled for Monday.