Plumbing the slab turned out to be fairly easy. Scott from S&K Plumbing kept the drain line high so that it will hopefully meet the existing drain lines in front of the house with the required slope (1/4" per foot) I dug a trench outside the foundation and strung lines where the walls would be. I plan to add a second drain pipe to the laundry that drains to the outside where it can be used to water plants (greywater)
Tuesday, October 30, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment